Pouring Large Commercial Slabs

Pouring Large Commercial Slabs

Here are our trucks pouring a large commercial slab.  Total yardage of over 200 yards.  The job seems quite large for mobile mix trucks, but it is also ideal for the volumetric batch on board system that our trucks use.    We can set our trucks next to the pump and start making concrete with all of the materials that we carry on board.  We can make about 60 yards per hour.  With our system, where we make the concrete on the truck, you won't have to move the truck.  Just stage the sand, gravel, water and cement at the job site and continuously replenish our trucks.  Need more than 60 yards per hour, we can employ two trucks to get up to 120 yards per hour.

 Commercial slab 200 yards 2Commercial slab 200 yards 2 trucks on the job